AI presentation builder

Type a topic. Get a finished deck. Then edit every pixel.

Reportif.AI turns a single prompt into a complete, on-brand presentation in seconds — then lets you refine every word, chart, icon and image inline, Gamma-style. Export to PPTX or PDF when it is ready.

Start building free

No credit card required. Web and desktop.

Protein Goes Premium — and Private
08 / 08Your finished deck
Protein Goes Premium — and Private
Inside the New Protein Basket
Where the protein peso lands: channel value share
Where protein demand is shifting across Mexico
The protein category at a glance, 2026
Honest protein, everyday pride
The quiet rebellion at the meat counter
Shoppers Rewrite the Basket
How it works

From idea to deck in four steps No blank-slide anxiety. Describe what you need and shape it from there.

01

Describe your topic

Type a prompt, paste an outline or import an existing document. Reportif.AI reads your intent and plans the narrative.

02

AI builds the deck

A complete presentation is generated with structured slides, real charts, icons and imagery — drawn from 128 editable layout families.

03

Edit every element inline

Click any text, chart, table, icon or image and change it in place. Nothing is locked — restyle, rewrite and rearrange freely.

04

Export and share

Download polished PPTX or PDF, ready for PowerPoint, Keynote or Google Slides. Your brand, your format.

Features

Everything you need to ship a great deck

A serious editor under a one-prompt start — built for people who present for a living.

Fully editable, Gamma-style

Every element on every slide is editable inline — text, charts, tables, icons, images and layout. Nothing is baked in.

Protein Goes Premium — and Private

128 layout families

Generation draws from 128 fully-editable recipe families and 95 composable blocks, so each slide fits its content instead of a rigid template.

Bring your own model

Run on Google Gemini, NVIDIA NIM or any OpenAI-compatible API. Route prep, generation and vision to the providers you trust.

AI and stock imagery

Generate visuals with Flux or Gemini, or pull from Pexels stock — plus a searchable library of 1,512 icons.

Native charts and tables

Real ECharts visualizations and editable tables — not flat images. Change the data and the chart updates live.

Import your brand as a blueprint

Upload an existing PPTX and Reportif.AI turns it into a reusable, branded blueprint for every future deck.

Export to PPTX and PDF

Hand off native PowerPoint files or polished PDFs — text stays text, charts stay charts, ready to keep editing anywhere.

Web and desktop

Use Reportif.AI in the browser or as a native desktop app for macOS, Windows and Linux. Your work follows you.

Where the protein peso lands: channel value share
Real product, every theme
Honest protein, everyday pride
Concept
Shoppers Rewrite the Basket
Section
Pricing

Simple, honest pricing no surprises.

Start free today. Paid plans are on the way.

Free

Everything you need to build and export your first decks.

$0/mo
  • Unlimited AI-generated decks
  • Full inline editing of every element
  • 128 layout families and 95 blocks
  • PPTX and PDF export
  • Web and desktop apps
Most popular

Pro

Higher limits, premium image generation and priority models for power users.

Coming soon
  • Everything in Free
  • Premium image generation
  • Priority model routing
  • Custom branded blueprints
  • Early access to new features

Team

Shared workspaces, brand controls and support for organizations.

Contact us
  • Everything in Pro
  • Shared team workspaces
  • Brand and template governance
  • Single sign-on (SSO)
  • Dedicated support
FAQ

Questions, answered clearly.

Everything you might want to know before you start.

Yes. Reportif.AI is a full editor, not a locked template. Every text run, chart, table, icon, image and layout on every slide is editable inline — click and change it.

Newsletter

Stay in the loop before everyone else.

Product updates, new layout families and launch news — no spam, unsubscribe anytime.

Start in minutes

Your next presentation is one prompt away.

Start free, build a complete deck in minutes and edit it down to the pixel.

No credit card required. Web and desktop.